Metals and Controls Corporation Information
Location
77 Massachusetts Avenue
Attleboro, Massachusetts

Records indicate that Metals and Controls Corporation fabricated fuel elements for production reactors, but it is unclear whether its work related to the nuclear weapons complex. For example, Metals and Controls Corporation fabricated uranium foils for reactor experiments and fuel components, fabricated complete reactor cores for the Naval Reactors program, and fabricated uranium fuel elements for experimental and research reactors. Records indicate shipments of depleted uranium between Rocky Flats and M&C during the period from 1955-1958.
During the period of residual contamination, as designated by the National Institute for Occupational Safety and Health and as noted in the dates above, employees of subsequent owners and operators of this facility are also covered under the Energy Employees Occupational Illness Compensation Program Act.
Alternative Names
- M & C
- Texas Instruments
- M&C Nuclear
- Metals and Controls Nuclear Corporation
Type of Facility
- Atomic Weapons Employer
Covered by EEOICPA
- Part B
EEOICPA Covered Years
- 1952-1967
- 1968-1997 (residual radiation)
Did work for:
- Rocky Flats
DOE
DOL
- Tracking your DOL Claim Status
- Advisory Board on Toxic Substances and Worker Health
- Ombudsman’s Office
- Resource Center
- DOL Case and Claim Statistics
- Approved Special Exposure Cohorts
- Bulletin 10-05: Metals and Controls SEC Class for the period January 1, 1952 through December 31, 1967
NIOSH
- FAQs About Your Case
- Advisory Board on Radiation and Worker Health
- AWE Site Wide Documents
- NIOSH Case Statistics
- Special Exposure Cohort Status Table
- Petition 149: “All Atomic Weapons Employees who worked at Metals and Controls Corp. in Attleboro, MA, from January 1,1952 to December 31, 1967, for a number of work days aggregating at least 250 work days, occurring either solely under this employment or in combination with work days within the parameters established for one or more other classes of employees included in the SEC.”
- Work Site Information
Other Resources
related posts
Wyman Gordon Incorporated Information
Location Grafton, North Grafton, MassachusettsWyman-Gordon supplied beryllium powder forgings and beryllium blanks to the Rocky Flats plant and beryllium metal and parts to the Y-12 plant. Type of Facility Beryllium Vendor Covered by EEOICPA Part B EEOICPA Covered...
Winchester Engineering and Analytical Center Information
Location Building Site 421 Winchester, MassachusettsThe Winchester Engineering and Analytical Center, built in 1952 under sponsorship of the AEC, was used to continue development of methods for extraction of uranium and thorium form ore and to prepare metal grade...
Watertown Arsenal, Building 421-Deleted
Location Congress Street Watertown, MassachusettsWatertown Arsenal is no longer a covered EEOICPA facility. Building 421 at the Watertown Arsenal, Watertown, MA was leased by the AEC for use under AEC contract #AT(30-1)-956. Work at this location was a continuation...



