Kansas City Plant
Location
Kansas City, Missouri
![1kansas-city[1]](https://eecap.org/wp-content/uploads/2025/01/1kansas-city201.jpg)
The Kansas City Plant was constructed in 1942 to build aircraft engines for the Navy. After World War II, it was used for storage. In 1949, the AEC asked the Bendix Corporation to take over part of the facility and it began manufacturing nonnuclear components for nuclear weapons. Electrical, electromechanical, mechanical, and plastic components are manufactured or procured by this facility.
In 1993, the Department of Energy officially designated the Kansas City Plant as the consolidated site for all nonnuclear components for nuclear weapons.
As of 1996, production activities at the site were still occurring and expected to continue indefinitely.
Throughout the course of its operations, the potential for beryllium exposure existed at this site, due to beryllium use, residual contamination, and decontamination activities.
Type of Facility
- Department of Energy
Covered by EEOICPA
- Part B and Part E
EEOICPA Covered Years
- November 5, 1948-Present
Contractors
- 1999-Present Honeywell FM&T
- 1949-1999 Allied-Signal Aerospace (formerly Bendix)
DOE
DOL
- Tracking your DOL Claim Status
- Advisory Board on Toxic Substances and Worker Health
- Ombudsman’s Office
- Resource Center
- DOL Case and Claim Statistics
- Site Exposure Matrix
EPA
NIOSH
Other Resources
related posts
Weldon Spring Raffinate Pits
Location 585-699 Mo 94 St. Charles, MissouriIn 1955 the U.S. Department of the Army (Army) transferred 217 acres of what had been the Weldon Springs Ordnance Works to the U.S. Atomic Energy Commission (AEC) to construct a uranium feed materials plant. In addition to...
Weldon Spring Quarry
Location Weldon Spring, Missouri In 1958, the U.S. Atomic Energy Commission (AEC) acquired title from the U.S. Department of the Army (Army) to an inactive quarry that had been on the Weldon Springs Ordnance Works land. The quarry was used by the AEC as a dumping...
Weldon Spring Plant
Location Weldon Spring, MissouriIn 1955, the U.S. Department of the Army (Army) transferred 217 acres of what had been the Weldon Springs Ordnance Works to the U.S. Atomic Energy Commission (AEC) for construction of a uranium feed materials plant. The AEC constructed...