Gardinier

Location

Tampa, Florida

 

Under contract to the AEC, Gardinier (under the name U.S. Phosphoric Products) operated a pilot plant from 1951 to 1954 which recovered uranium from phosphoric acid. From 1956 to 1961, it produced uranium by recovery of U3O8 from phosphoric acid. Maximum production was 60 tons of uranium concentrate per year. The uranium was ultimately used in weapons production.
During the period of residual contamination, as designated by the National Institute for Occupational Safety and Health and as noted in the dates above, employees of subsequent owners and operators of this facility are also covered under the Energy Employees Occupational Illness Compensation Program Act.

Alternative Names

  • U.S. Phosphoric Plant Uranium Recovery Unit
  • Cargill Fertilizer, Inc.
  • U.S. Phosphoric Products Division of The Tennessee Corporation

Type of Facility

  • Atomic Weapons Employer

Covered by EEOICPA

  • Part B

EEOICPA Covered Years

  • 1951-1954
  • 1956-1961
  • 1955 (residual radiation)
  • 1962-March 1, 2011

DOE

DOL

NIOSH

Other Resources

related posts

W.R. Grace, Agricultural Chemical Division

W.R. Grace, Agricultural Chemical Division

Location Ridgewood, FloridaFor one month in 1954, W.R. Grace performed the pilot plant work on solvent extraction for Armour Fertilizer, which used the solvent process to extract uranium from phosphates. Type of Facility Atomic Weapons Employer Covered by EEOICPA Part...

read more
Virginia-Carolina Chemical

Virginia-Carolina Chemical

Location Nichols, FloridaThe Virginia-Carolina Chemical Corporation produced uranium as a byproduct of the recovery of phosphate chemicals and fertilizers. The AEC contracted with the Virginia-Carolina Chemical Corp. for the recovery of the uranium, which was...

read more
University of Florida

University of Florida

Location Gainesville, Florida   Documents indicate that the University of Florida handled test quantities of radioactive material under a National Lead of Ohio (Fernald) sub-contract between 1963 and 1969. Upon completion of the project, the material was sent to the...

read more