United Steel Workers' Local 8031 donated Safety Concern Documents to ANWAG
ANWAG offers its deep appreciation to the United
Steel Workers’ Local 8031 for the donation of their
historical documents from the former Rocky Flats nuclear
weapons facility. These documents include safety
concerns and grievances were filed by the rank and file
workers to notify management of issues which could have
had, or in some cases did have, a negative effect on the
health and safety of the workers who worked to keep
America safe during the Cold War.
It is ANWAG’s
and Local 8031’s hope that these documents will provide
the evidence necessary to prove a claim under EEOICPA
for Rocky Flats claimants.
A sincere debt of gratitude also goes out to Cold War Patriots for providing the financial assistance necessary for this project.
-
1984-12-31 Rocky Flats Radiation Monitoring Report-B Box exceeding 20,000c/m
-
1985-7-10 Rocky Flats Radiation Monitoring Procedure Violation-working with personal clothing
-
1985-7-28 Rocky Flats Radiation Monitoring Procedure Violation-hot hands
-
1985-11-6 Rocky Flats Radiation Monitoring Procedure Violation-drain overflowed, floor hot
-
1986-1-1 Rocky Flats Radiation Monitoring Report-coveralls hot
-
1986-2-7 Rocky Flats Joint Company-Union Safety Committee Concern Form-contaminated lab
-
1986-5-22 Rocky Flats Radiation Monitoring Procedure Violation-working in hot area w/o protection
-
1986 10-3 Rocky Flats Radiation Monitoring Incident-possible inhalation
-
1986-11-1 Rocky Flats Radiation Monitoring Procedure Violation-contamination-SAAM did not alarm
-
1986-11-14 Rocky Flats Union Safety Committee Audit in Building 771
-
1986-11-25 Rocky Flats Radiation Monitoring Incident w/possible inhalation and procedure violation
-
1986-12-2 Rocky Flats Radiation Monitoring Incident-possible inhalation
-
1987-2-20 Rocky Flats Radiation Monitoring Report-contaminated hand
-
1988 Rocky Flats Joint Company-Union Safety Committee Concern Form-ventilation system filthy
-
1988-8-25 Rocky Flats Safety Concern Status Report-4 gallon plutonium feed spill
-
1988-11-16 Rocky Flats Safety Concern Status Report-maintenance and calibration problem
-
1988-12-6 Rocky Flats Safety Concern Status Report-coffins and drums stored in hallway
-
1988-12-6 Rocky Flats Safety Concern Status Report-gamma, neutron readings above ALARA policy
-
1988-12-6 Rocky Flats Safety Concern Status Report-not enough monitors
-
1989-3-1 Rocky Flats Safety Concern Status Report-no SAAM alarm
-
1990-1-11 Rocky Flats Joint Company-Union Safety Committee Concern-cross contamination with water
-
1990-1-22 Rocky Flats Joint Company-Union Safety Committee Concern-air filter counting system
-
1990-3-9 Rocky Flats Joint Company-Union Safety Committee Concern-bioassay problems
-
1990-5-2 Rocky Flats Joint Company-Union Safety Committee Concern Form-unqualified personnel
-
1990-5-10 Rocky Flats Joint Company-Union Safety Committee Concern Form-inadequate training
-
1990-6-25 Rocky Flats Joint Company-Union Safety Committee Concern Form-contaminated airhead samples
-
1990-12-18 Rocky Flats Joint Company-Union Safety Committee Concern Form-disregarding ARARA
-
1990-12-19 Rocky Flats Joint Company-Union Safety Committee Concern-no alarm
-
1991-11-25 Rocky Flats Verification Implementation-Bio-Assay problems
-
1992-3-3 Rocky Flats Joint Company-Union Safety Committee Concern-failure to count air heads
-
1992-5-12 Rocky Flats Joint Company-Union Safety Committee Concern-contaminated nose wipes
-
1992-6-29 Rocky Flats Joint Company-Union Safety Committee Concern-work restriction
-
1992-6-30 Rocky Flats Joint Company-Union Safety Committee Concern-forgery
-
1992-7-21 Rocky Flats Joint Company-Union Safety Committee Concern-dosimetry issue
-
1992-8-5 Rocky Flats Joint Company-Union Safety Committee Concern-maintenance issue
-
1992-10-16 Rocky Flats Joint Company-Union Safety Committee Concern-hallway air contamination
-
1992-10-16 Rocky Flats Joint Company-Union Safety Committee Concern-personnel not trained
-
1992-11-9 Rocky Flats Joint Company-Union Safety Committee Concern-no alpha detection
-
1992-11-30 Rocky Flats Joint Company-Union Safety Committee Concern-worker not notified
-
1992-12-4 Rocky Flats Joint Company-Union Safety Committee Concern-unqualified RPTs
-
1992-12-14 Rocky Flats Joint Company-Union Safety Committee Concern-no alarms
-
1993-3-17 Rocky Flats Joint Company-Union Safety Committee Concern-procedures violated
-
1994-3-3 Rocky Flats Joint Company-Union Safety Committee Concern-alpha counting issue
-
1994-3-4 Rocky Flats Joint Company-Union Safety Committee Concern-radon contamination
-
1994-6-24 Rocky Flats Joint Company-Union Safety Committee Concern-no medical surveillance
-
1994-8-12 Rocky Flats Joint Company-Union Safety Committee Concern-no alarms
-
1994-9-19 Rocky Flats Joint Company-Union Safety Committee Concern-no pipetor
-
1996-7-11 Rocky Flats Joint Company-Union Safety Committee Concern-lack of safety
-
1996-7-11 Rocky Flats Joint Company-Union Safety Committee Concern-surveys wrong
-
1997-1-16 Rocky Flats Joint Company-Union Safety Committee Concerns-contamination controls
-
1997-7-21 Rocky Flats Kaiser-Hill Co. and US Steelworkers Local 8031 Arbitration-McEndree
-
1997-9-27 Rocky Flats Joint Company-Union Safety Committee Concerns-contamination
-
1998-7-15 Rocky Flats Joint Company-Union Safety Committee Concerns-increased dose limits
-
2000-2-9 Rocky Flats Joint Company-Union Safety Committee Concerns-contamination
-
2000-2-16 Rocky Flats Joint Company-Union Safety Committee Concerns-contamination
-
2000-3-18 Rocky Flats Joint Company-Union Safety Committee Concerns-contamination
-
2000-3-22 Rocky Flats Joint Company-Union Safety Committee Concerns-transportation sources
-
2000-5-12 Rocky Flats Joint Company-Union Safety Committee Concerns-glove box contamination
-
2000-6-5 Rocky Flats Joint Company-Union Safety Committee Concerns-no SAAMS
-
2000-6-8 Rocky Flats Joint Company-Union Safety Committee Concerns-performance tests
-
2000-6-30 Rocky Flats Joint Company-Union Safety Committee Concerns-ventilation problems
-
2000-7-13 Rocky Flats Joint Company-Union Safety Committee Concerns-exceed 100 mrem
-
2000-7-19 Rocky Flats Joint Company-Union Safety Committee Concerns-nitric acid spill
-
2000-7-31 Rocky Flats Joint Company-Union Safety Committee Concerns-unnecessary exposure
-
2000-8-9 Rocky Flats Joint Company-Union Safety Committee Concerns-worn gloves
-
2000-8-30 Rocky Flats Joint Company-Union Safety Committee Concerns-dosimetry badges
-
2000-9-13 Rocky Flats Joint Company-Union Safety Committee Concerns-air lines
-
2000-11-5 Rocky Flats Joint Company-Union Safety Committee Concerns-RCT support
-
2000-11-15 Rocky Flats Joint Company-Union Safety Committee Concerns-no SAAM