Gerity-Michigan Corporation

Location

Adrian, Michigan

 

Gerity-Michigan operated a 2200/550 ton tube and rod extrusion press and performed the first extrusion of beryllium there on May 11, 1949 for the AEC. Documentation, specifically accountability reports, indicates that work continued there through the 1950s.
Gerity-Michigan was also under contract to the AEC to put extrusion presses into operating condition at the Adrian, Michigan facility.

Alternative Names

  • Canton Drop Forging and Manufacturing

Type of Facility

  • Beryllium Vendor

Covered by EEOICPA

  • Part B

EEOICPA Covered Years

  • 1949-1950s

DOE

DOL

related posts

Wolverine Tube Division

Wolverine Tube Division

Location Detroit, Michigan   In 1943, the University of Chicago subcontracted to Wolverine Tube of Detroit, Michigan, for help in extrusion of metals that were needed as part of the Manhattan Project. Wolverine Tube performed research on the fabrication of aluminum...

read more
University of Michigan

University of Michigan

Location Ann Arbor, Michigan   The University of Michigan developed radar fuses and conducted ordnance research to assist Los Alamos in atomic bomb research and production.Records indicate that small quantities of uranium metal were handled at the University of...

read more
Star Cutter Corporation

Star Cutter Corporation

Location Farmington, Michigan The Star Cutter Corporation manufactured machine tools. Records indicate that National Lead of Ohio (Fernald) conducted a one-time test of a Star Cutter drill to hollow uranium slugs. Alternative Names Hitachi Farmington Hills Technology...

read more