Iowa Ordnance Plant-Line 1 and Associated Activities Information

Location

17571 DMC Highway 79

Middletown, IA 52638

The Iowa Ordnance Plant (IOP), also known as the Iowa Army Ammunition Plant (IAAP), is a load, assemble, and pack munitions facility that began production in 1941 and continues to operate as a Government-owned, contractor-operated installation. Between 1947 and 1974, a portion of the IAAP was operated under contract to the Atomic Energy Commission (AEC) for the purpose of supplying the AEC with explosive components for nuclear weapons. The area of the IOP that performed work for the AEC includes the buildings and property/grounds of the IAAP that is identified as Line 1, as well as Yards C, G and L and the Firing Site Area, Burning Field “B” and the storage sites for pits and weapons, including Buildings 73 and 77. Work performed in these areas is covered under the Energy Employees Occupational Illness Compensation Program Act. In 1974, the AEC closed out its activities at the plant and transferred all functions to the Pantex Plant.

Throughout the course of its operations, the potential for beryllium exposure existed at this site, due to beryllium use, residual contamination, and decontamination activities.

Alternative Names

  • Burlington Ordnance Plant
  • Silas Mason Company
  • Mason & Hanger
  • Iowa Army Ammunition Plant

Type of Facility

  • Department of Energy

Covered by EEOICPA

  • Part B and Part E

EEOICPA Covered Years

  • 1947-1974

Contractors

  • Mason & Hanger-Silas Mason Company (1947-1974)

Army Corps of Engineers

DOE

DOL

NIOSH

  • FAQs About Your Case
  • Advisory Board on Radiation and Worker Health
  • NIOSH Case Statistics
  • Special Exposure Cohort Status Table
    • Petitions 006, 007, 014, 015: “Employees of the Department of Energy (DOE) or DOE contractors or subcontractors employed by the Iowa Army Ammunition Plant, Line 1, during the period from March 1949 through 1974 and who were employed for a number of work days aggregating at least 250 work days either solely under this employment or in combination with work days within the parameters (excluding aggregate work day requirements) established for other classes of employees included in the SEC.”
    • Petitions 006, 007, 014, 015: “
      Department of Energy (DOE) employees or DOE contractor or subcontractor employees who worked as radiographers from May 1948 to March 1949 in support of Line 1 operations at the Iowa Army Ammunition Plant and who were employed for a number of work days aggregating at least 250 work days either solely under this employment or in combination with work days within the parameters (excluding aggregate work day requirements) established for other classes of employees included in the SEC.”
  • Work Site Information

Other Resources

related posts

Titus Metals Information

Titus Metals Information

Location Waterloo, IowaTitus Metals performed the extrusion of uranium oxide billets into fuel plates for the Argonaut reactor at Argonne National Laboratory on June 29, 1956. Type of Facility Atomic Weapons Employer Covered by EEOICPA Part B EEOICPA Covered Years...

read more
Bendix Aviation Information

Bendix Aviation Information

Location Wallace Road Davenport, IowaOn three separate occasions, National Lead of Ohio (Fernald) personnel conducted tests to see how well a Bendix sonic energy cleaning system could clean uranium-contaminated 55 gallon drums. At least 18 contaminated drums were test...

read more
Ames Laboratory Information

Ames Laboratory Information

Location Ames, IowaAmes Laboratory is located on the Iowa State University Campus in Ames, Iowa. During the Manhattan Project, researchers at Iowa State perfected a magnesium reduction process, producing pure uranium metal that quickly became the industry standard....

read more